Erzurum Ski Jumping Ramps Project
For the 5 different Ski Jumping Ramps which served in University Winter Olympic games which were constructed by Akgün Insaat A.S company, GLOBAL has produced and applied the following items;
- Ski Jumping ramp side boards
- Ski jumping ramps wind blocking panels
- Ski jumping ramp stairs
- Ski jumping ramp stair handrails
- Landing area side boards
Production and installation of these special products required 500 tons of steel work and nearly 5000 m2 of plastic sheet material.
The project delivery time was more than 6 months.